{"id":2301,"date":"2026-07-17T10:42:58","date_gmt":"2026-07-17T08:42:58","guid":{"rendered":"https:\/\/trojmiasto.online\/?p=2301"},"modified":"2026-07-17T10:43:01","modified_gmt":"2026-07-17T08:43:01","slug":"s-subboty-izmenitsya-dvizhenie-na-hucisko-novyj-etap-rabot","status":"publish","type":"post","link":"https:\/\/trojmiasto.online\/en\/gdansk\/s-subboty-izmenitsya-dvizhenie-na-hucisko-novyj-etap-rabot\/","title":{"rendered":"Starting Saturday, traffic will change on Hucisko. New phase of work"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Starting from July 18, the second phase of temporary traffic organization will begin at Hucisko in Gda\u0144sk. The changes will last for about two weeks and are related to the ongoing modernization of the transport hub. This is the penultimate stage of the works \u2014 after this, only the final temporary traffic scheme will remain before the completion of the repairs.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prace na Hucisku s\u0105 prowadzone etapami, aby zminimalizowa\u0107 zak\u0142\u00f3cenia w ruchu. Pierwszy etap zosta\u0142 zako\u0144czony tydzie\u0144 przed terminem, co umo\u017cliwi\u0142o wcze\u015bniejsze otwarcie pe\u0142nego ruchu przez skrzy\u017cowanie.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img  loading=\"lazy\"  decoding=\"async\"  width=\"1024\"  height=\"537\"  src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAABAAAAAIZAQMAAAAC2t+pAAAAA1BMVEUAAP+KeNJXAAAAAXRSTlMAQObYZgAAAAlwSFlzAAAOxAAADsQBlSsOGwAAAFpJREFUeNrtwTEBAAAAwqD1T20MH6AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAzgYOqAABCAWeHAAAAABJRU5ErkJggg==\"  alt=\"\"  class=\"wp-image-2302 pk-lazyload\"  data-pk-sizes=\"auto\"  data-ls-sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"  data-pk-src=\"https:\/\/trojmiasto.online\/wp-content\/uploads\/2026\/07\/1192-625_-1-1024x537.webp\"  data-pk-srcset=\"https:\/\/trojmiasto.online\/wp-content\/uploads\/2026\/07\/1192-625_-1-1024x537.webp 1024w, https:\/\/trojmiasto.online\/wp-content\/uploads\/2026\/07\/1192-625_-1-300x157.webp 300w, https:\/\/trojmiasto.online\/wp-content\/uploads\/2026\/07\/1192-625_-1-768x403.webp 768w, https:\/\/trojmiasto.online\/wp-content\/uploads\/2026\/07\/1192-625_-1.webp 1192w\" ><\/figure>\n\n\n\n<h3 id=\"what-will-change-for-drivers\" class=\"wp-block-heading\">What will change for drivers<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Starting from July 18, drivers exiting from <strong>Targ Drzewny<\/strong> will only be able to turn right \u2014 towards <strong>Dworzec G\u0142\u00f3wny<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When driving on <strong>Wa\u0142y Jagiello\u0144skie<\/strong> from the side of <strong>Okopowa<\/strong>, it will no longer be possible to turn left onto <strong>ul. Hucisko<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The restrictions that have been in place since the beginning of the repairs remain unchanged<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n\n<li>traffic on <strong>ul. Hucisko<\/strong> is still narrowed;<\/li>\n\n\n\n<li>The passage through Nowe Podwale (tunnel under Forum) towards Wrzeszcz is closed<\/li>\n<\/ul>\n\n\n\n<h3 id=\"changes-for-pedestrians\" class=\"wp-block-heading\">Changes for Pedestrians<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Starting from July 18, the pedestrian traffic scheme will also change. The pedestrian crossing over <strong>Wa\u0142y Jagiello\u0144skie<\/strong> near the <strong>Rada Miasta Gda\u0144ska<\/strong> building will be closed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">You will be able to cross the road at the crossing near <strong>Skwer im. Polskich Harcerzy<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The final stage of the temporary traffic organization is planned to be introduced in about two weeks<\/p>\n","protected":false},"excerpt":{"rendered":"<p>From July 18, the second phase of the temporary traffic organization will begin on Hucisko in Gda\u0144sk. The changes will last for about two weeks and are related to the ongoing modernization of the transport hub. This is the penultimate stage of the work \u2014 after this, only the final temporary traffic scheme will remain to be introduced before the completion of the repairs.<\/p>\n","protected":false},"author":1,"featured_media":2303,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,63,2,4],"tags":[],"class_list":["post-2301","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gdansk","category-dorogi","category-novosti","category-transport"],"_links":{"self":[{"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/posts\/2301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/comments?post=2301"}],"version-history":[{"count":1,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/posts\/2301\/revisions"}],"predecessor-version":[{"id":2304,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/posts\/2301\/revisions\/2304"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/media\/2303"}],"wp:attachment":[{"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/media?parent=2301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/categories?post=2301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trojmiasto.online\/en\/wp-json\/wp\/v2\/tags?post=2301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}